Chama Area
Western most terminus of the D&RGW 3rd Division Layout and the starting point of construction.
Read More4 / 19
The table lined up and locked into place. Now I just need to lay some rail and we will be ready to go.
One other note on the connectors. The male side pins will move in when contact is made with the female side, so you will need to have a means to lock in place. In my case I am using the simple draw catches in two locations. One is on the front (that you see) and the other is on the bottom of the table (near the connectors).
- No Comments