Garfield Peninsula
2nd Middle section of the layout and the climb area from the Salida Yard area.
Read More24 / 32
The island has been completed and now onto the track work (well...sub-bed anyway). The 190 degree turn through the lower tunnel portal has been installed (with the track work inside the tunnel being installed as well). The straight section is going to be the Maysville siding, so where hopefully we will be able to Double the Turn properly :)
- No Comments