1. Construction
  2. Benchwork

Upper Deck to CFI and Beyond

Upper Deck of the layout, which goes through a fictitious town before reaching the CF&I facility. From there the mainline moves on to Cero Summit and then on to Montrose.
Read More
The upper deck is transitioning over to the CF&I Quarry at Monarch.  The track to the right (as seen from the previous picture) will be the location of a fictitious town (name to be determined) that will allow for a bit more 'work' to be done on the upper deck.
21 / 21

The upper deck is transitioning over to the CF&I Quarry at Monarch. The track to the right (as seen from the previous picture) will be the location of a fictitious town (name to be determined) that will allow for a bit more 'work' to be done on the upper deck.

  • The upper deck is transitioning over to the CF&I Quarry at Monarch.  The track to the right (as seen from the previous picture) will be the location of a fictitious town (name to be determined) that will allow for a bit more 'work' to be done on the upper deck.
  • No Comments
  • Photo Sharing
  • About SmugMug
  • Browse Photos
  • Prints & Gifts
  • Terms
  • Privacy
  • Contact
  • Owner Log In
© 2023 SmugMug, Inc.