Upper Deck to CFI and Beyond
Upper Deck of the layout, which goes through a fictitious town before reaching the CF&I facility. From there the mainline moves on to Cero Summit and then on to Montrose.
Read More13 / 21
This is the area of the coal loading facility (loading ramp and trucks). The idea is to use the run around track (left out of view) to get the cars staged to where they need to be. Empties will be put here on trips up to Montrose and will be picked up either by a local or by the next train down from Montrose.
- No Comments