1. Construction
  2. Models

CF&I Limestone Loader

CF&I Limestone Loader that was located at Monarch Pass.
Read More
Sub Structure and Chute Floor
7 / 47

Sub Structure and Chute Floor

Now some of the substructure is coming together. The floor of the chute was made out of styrene with grooves to give the appearance of wood. The chutes were made completely out of wood and attached to the floor. Only the right most chute will actually function, as I didn't want too much material coming out at one time.

  • CFI Loader Video
  • Untitled photo
  • Untitled photo
  • The First Pieces
  • Dock
  • This is the side wood structure of the chute.  This again was constructed with basswood that I purchased at Blackbearcc.com.  It was cut to size, then stained before final gluing.  Most of the glue used on the structure was Aleene's Tacky Glue.
  • Sub Structure and Chute Floor
  • Close up of Chute Floor
  • Sub Structure test fit
  • Bunker Level
  • Bunker Front
  • Stairs....
  • Side view of bunker chute
  • Bracing, Bracing, and More Bracing
  • Another Test Fit
  • Close up of Bunker Floor
  • Bunker Door
  • Third Level
  • More Wood out of Styrene
  • Hill Construction
  • No Comments
  • Photo Sharing
  • About SmugMug
  • Browse Photos
  • Prints & Gifts
  • Terms
  • Privacy
  • Contact
  • Owner Log In
© 2023 SmugMug, Inc.