1. Construction
  2. Models

CF&I Limestone Loader

CF&I Limestone Loader that was located at Monarch Pass.
Read More
Dock
5 / 47

Dock

This is the dock area that most of the substructure rests on. It was constructed out of various thicknesses of styrene laminated together. The top pieces were distressed with sandpaper and expansion joints and cracks were added.

CFI LoaderCFI Limestone

  • CFI Loader Video
  • Untitled photo
  • Untitled photo
  • The First Pieces
  • Dock
  • This is the side wood structure of the chute.  This again was constructed with basswood that I purchased at Blackbearcc.com.  It was cut to size, then stained before final gluing.  Most of the glue used on the structure was Aleene's Tacky Glue.
  • Sub Structure and Chute Floor
  • Close up of Chute Floor
  • Sub Structure test fit
  • Bunker Level
  • Bunker Front
  • Stairs....
  • Side view of bunker chute
  • Bracing, Bracing, and More Bracing
  • Another Test Fit
  • Close up of Bunker Floor
  • Bunker Door
  • Third Level
  • More Wood out of Styrene
  • Hill Construction
  • No Comments
  • Photo Sharing
  • About SmugMug
  • Browse Photos
  • Prints & Gifts
  • Terms
  • Privacy
  • Contact
  • Owner Log In
© 2023 SmugMug, Inc.