1. Construction
  2. Models

CF&I Limestone Loader

CF&I Limestone Loader that was located at Monarch Pass.
Read More
Bunker Level
10 / 47

Bunker Level

Now the chute floor and bunker walls are starting to come together. I did as much bracing on the floor and walls as possible due to the load that would be held on these critical pieces.

  • CFI Loader Video
  • Untitled photo
  • Untitled photo
  • The First Pieces
  • Dock
  • This is the side wood structure of the chute.  This again was constructed with basswood that I purchased at Blackbearcc.com.  It was cut to size, then stained before final gluing.  Most of the glue used on the structure was Aleene's Tacky Glue.
  • Sub Structure and Chute Floor
  • Close up of Chute Floor
  • Sub Structure test fit
  • Bunker Level
  • Bunker Front
  • Stairs....
  • Side view of bunker chute
  • Bracing, Bracing, and More Bracing
  • Another Test Fit
  • Close up of Bunker Floor
  • Bunker Door
  • Third Level
  • More Wood out of Styrene
  • Hill Construction
  • No Comments
  • Photo Sharing
  • About SmugMug
  • Browse Photos
  • Prints & Gifts
  • Terms
  • Privacy
  • Contact
  • Owner Log In
© 2023 SmugMug, Inc.