1. Construction
  2. Models

CF&I Limestone Loader

CF&I Limestone Loader that was located at Monarch Pass.
Read More
Stairs....
12 / 47

Stairs....

In looking over pictures I noticed that there were stairs extending from the dock area to the next level. So of course those were needed in the structure. And who knew that making stairs was so time consuming.

  • CFI Loader Video
  • Untitled photo
  • Untitled photo
  • The First Pieces
  • Dock
  • This is the side wood structure of the chute.  This again was constructed with basswood that I purchased at Blackbearcc.com.  It was cut to size, then stained before final gluing.  Most of the glue used on the structure was Aleene's Tacky Glue.
  • Sub Structure and Chute Floor
  • Close up of Chute Floor
  • Sub Structure test fit
  • Bunker Level
  • Bunker Front
  • Stairs....
  • Side view of bunker chute
  • Bracing, Bracing, and More Bracing
  • Another Test Fit
  • Close up of Bunker Floor
  • Bunker Door
  • Third Level
  • More Wood out of Styrene
  • Hill Construction
  • No Comments
  • Photo Sharing
  • About SmugMug
  • Browse Photos
  • Prints & Gifts
  • Terms
  • Privacy
  • Contact
  • Owner Log In
© 2023 SmugMug, Inc.