1. Construction
  2. Scenery

Starting Scenery

Time for some scenery. This folder is not location specific
Read More
Shell Ingredients
26 / 52

Shell Ingredients

For my hardshell I am using used dryer sheets dripped in a hydrocal and baking powder mixture. (2C of Hydrocal and 1 1/3 tsp of Baking Powder). The baking powder acts as a retarder of the hydrocal, giving a slightly longer use time before it sets up. I was able to get fully through the 2C of mixture before it would fully setup.

  • Windy Point Coming together
  • Untitled photo
  • Untitled photo
  • Untitled photo
  • Garfield Shell completed
  • Shell Ingredients
  • Garfield Switchbacks with cover.
  • Completed Structure of Windy Point
  • Lobito Lake Profile
  • Lobato Lake
  • Cresco Siding
  • Windy Point
  • Let there be COLOR!
  • Rock area progressing
  • Rock Work
  • Mears Bridge Piles
  • Test Fit
  • Anchoring the Piles
  • Details Details Details
  • Mears Junction Bridge - Details
  • No Comments
  • Photo Sharing
  • About SmugMug
  • Browse Photos
  • Prints & Gifts
  • Terms
  • Privacy
  • Contact
  • Owner Log In
© 2023 SmugMug, Inc.